Commissioned by Voortman Steel Construction, we positioned a 32 meter long railway bridge at VION Food Group in Boxtel. The bridge, weighing 15 tons, is positioned early morning, in order to not disturb the logistic process at VION.
This walkway bridge is the proverbial last piece of the puzzle: the last part of the steel construction which connects the new construction with the existing part. The entire project is completed successfully and according schedule.