Cases

Mega duo on the move

The Chemelot site in Geleen aims to become Europe's first circular chemistry site by 2050, using sustainable, non-fossil raw materials and energy to produce plastics for everyday use. This transition requires adjustments to the infrastructure and facilities. Last summer, two huge storage tanks had to be transported to the site for an infrastructure project. This required the temporary closure of the A2 motorway. A major transport challenge!

Read more

Masterpiece in Meeden

The Meeden high-voltage substation has existed for 50 years and is an important link in the power supply for the region and the rest of the Netherlands. From Meeden, there is also a connection to a high-voltage substation in the German town of Diele, so that power can be exchanged between the Netherlands and Germany.

Read more

The winners from Wagenborg Nedlift

Every day, the Wagenborg Nedlift team is busy with safe and professional solutions for its customers and partners, both at home and abroad. Whether it involves placing a dormer, installing a complete bridge or transporting heavy transformers, each solution is tailor-made and aims to realise the customer's project safely and within the schedule. It has certainly been noticed that the professionals from Wagenborg Nedlift can come up with technically very ingenious and inventive solutions!

Read more

On the road with..... Roelof Dijk

The morning sun at the Wagenborg terminal in Eemshaven isn’t very warm yet. Roelof and his colleague Jacob Hollander go over the transport plan. Jacob will soon be driving the mobile crane, Roelof the semi low loader. They are going to lift a cable reel of no less than 20 tonnes from a ship and place it on the low loader. They will then transport the colossus (340 cm wide and 590 cm high) to the high-voltage location. A matter of ‘staying focused’ and careful manoeuvring.

Read more

The Köthen colossus installed!

The inhabitants of Köthen had to wait for over a year, but in mid-April the big day had finally arrived: the new Prosigker Bridge was installed.

Read more

Railway bridge Plate uniquely installed

The railway bridge over the A14 in Plate (near Schwerin, Germany) was in need of replacement. The new arched bridge was assembled next to the motorway on a tiny building site and had to be installed during a short closure of the motorway on the weekend. A nice challenge for the heavy lift specialists from Wagenborg Nedlift!

Read more

"If I knew back in 2006 what I know now about your company, Wagenborg would definitely have got the contract!”

Wagenborg Nedlift has built up an excellent reputation in transporting transformers in Europe; from The Netherlands to Germany, from Scandinavia to Austria; by road, rail and sea. Projects are always safe, on schedule and completed as agreed.

Read more

'A good cooperation is not just pleasant, it is also essential for a safe and successful execution of a project'

WAGENBORG TRANSPORTED THE FIRST POLY GENERATION PYROLYSIS PLANT OF EUROPE TO HENGELO, ONLY 15 KILOMETERS AWAY FROM ITS BIRTHPLACE ENSCHEDE.

Read more

Giant gas storage tanks to Krefeld

September 2018, Wagenborg Nedlift carried out the impressive transport of 5 enormous gas storage tanks from Haren (Germany) to Krefeld (Germany).

Read more

Please contact us!

We will be happy to assist you

Contact