Cases

Railway bridge Plate uniquely installed

The railway bridge over the A14 in Plate (near Schwerin, Germany) was in need of replacement. The new arched bridge was assembled next to the motorway on a tiny building site and had to be installed during a short closure of the motorway on the weekend. A nice challenge for the heavy lift specialists from Wagenborg Nedlift!

Read more

Inventive lifting solution for heavy bridge girders

There has been much road work on the Autobahn A30 between Osnabrück and Hanover to renew the lanes and renovate bridges. The Werrebrücke is situated near the village of Löhne, crossing the river of the same name. This required reinforcement with heavy steel beams. The Wagenborg Nedlift specialists came up with an inventive solution for the installation of the beams.

Read more

Clever installation method for Hamburg Lessing Tunnel

The Lessing Tunnel in Hamburg is a 110-metre-long railway underpass located north of the Hamburg-Altona railway station. Six new tunnel sections, each weighing 340 tonnes, were brought in for the renovation from a construction site 2.5 kilometres away. A great challenge for the Wagenborg Nedlift transport specialists

Read more

Podiumbrücke Bocholt - bridge from the past to the future

In October 2018, Wagenborg Nedlift carried out an impressive operation in Bocholt (Germany): transport, positioning and foundation setting of the 47-metre-long Podiumbrücke (Podium Bridge). Wagenborg Nedlift combined many different disciplines and skills to successfully and safely install this bridge from the past to the future.

Read more

Unusual bridge transport

The bridge deck of the bridge in Gramsbergen (Overijssel, the Netherlands) crossing the Almelo-De Haandrik canal had to be replaced due to the poor condition of the old wooden bridge deck. The new bridge deck was made of steel to guarantee a long lifespan.

Read more

A gateway to the east

Kirkenes is ideally suited for observing the Northern Lights. Regardless of this draw, the Norwegian landmark feels like a final destination; end of the line for both roads and ferries. Yet Kirkenes, situated at a mere 10 kilometres from Russia, is known as the ‘gateway to the east’. Renovating the existing E105 targets the facilitation of trade and cooperation between neighbouring countries. Part of this upgrade is the construction of the Bøkfjord bridge; the 120 metre arched steel bridge spanning the Norwegian fjords, connecting Norway and Russia. A complex logistical challenge for Wagenborg to overcome.

Read more

Switcheroo in Münster

The Hanseatic city of Münster (Germany) has no fewer than 17 bridges across the Dortmund - Ems Canal. A number of these bridges are in need of renovation or renewal, including the Schillerstrasse Brücke.

Read more

Inching and pinching: Trogbrücke Emden

The new Trogbrücke in Emden replaces an old railway bridge which is not meeting modern railway traffic standards anymore. The new railway bridge is 8.80 meters wide (2.60 meters wider than the previous bridge) and gives access to modern railwagons with larger cargo dimensions. The new 550 tons weighing railway bridge has had a construction period of only 6 months.

Read more

The 'Green Connection'

The Green Connection is a pedestrian and bicycle bridge connecting the south of Rotterdam with the green space outside the city. The bridge is nearly 200 metres long, weighs over 600 tonnes and spans the Betuwe railway line and the A15 motorway. The transport and lifting operation of the uniquely-designed bridge presented a special challenge.

Read more

Please contact us!

We will be happy to assist you

Contact