Cases

Craftsmanship crane operators is gold standard at Pontsteiger Amsterdam

Wagenborg transported and installed 4 enormous steel trusses as part of the construction of the Pontsteiger in Amsterdam. These trusses, built Almelo (NL), connect the Pontsteiger’s two luxurious residential towers.

Read more

Hoisting in a tight space

The 180-metre long striking Nelson Mandela bridge, built in 1992, was due for renovation. Entrance, staircases and elevators were renewed and installed entirely in the existing building. A unique vertical transport challenge!

Read more

Switcheroo in Münster

The Hanseatic city of Münster (Germany) has no fewer than 17 bridges across the Dortmund - Ems Canal. A number of these bridges are in need of renovation or renewal, including the Schillerstrasse Brücke.

Read more

Holland Malt's capacity at Eemshaven doubled

Worlwide beer consumption is increasing. This growing market means there is also more demand for pils malt. Holland Malt is responding to this development by expanding its malting plant at Eemshaven with two enormous modern new storage silos. This has doubled annual malting capacity at Eemshaven from 140,000 tonnes to no less than 280,000 tonnes.

Read more

Tandemlift conveyor belts

At the sugar mill in Vierverlaten (Groningen, the Netherlands), Wagenborg Nedlift transported and installed the sections of a new conveyor belt. The new conveyor belt will increase daily production capacity of the sugar mill with 2.500 tonnes, up to a total daily production of 28.500 tonnes.

Read more

From construction site to theme park - Wildlands Adventure Zoo Emmen

The construction of Wildlands Adventure Zoo in Emmen was a large-scale and innovative project. An adventurous animal theme park with a unique and innovative character. Wagenborg Nedlift was engaged to carry out the lifting and transport work for the construction and furnishing of the park and the relocation of the animals to their brand new enclosures.

Read more

Expansion of gas storage capacity Norg+

For decades, gas has been stored in the underground gas storage locations (UGS) in Norg and Grijpskerk in the north of the Netherlands. These gas reserves are intended for extreme winter periods. Due to increasing demand the capacity of the UGS location Norg required expansion. Under the name Norg+, this project was started in 2011 and completed at the end of 2014.

Read more

Please contact us!

We will be happy to assist you

Contact