The crane fleet of Wagenborg Nedlift has recently been expanded with the latest model in the 300 tonne range from the Manitowoc stable: the Grove GMK6300L-1. A beautiful addition!
Recently, a new bridge has been installed over the Emscher to the Emscherinsel in Essen-Karnap (Germany). And not just any bridge: besides being a bicycle and pedestrian bridge, it is also a pipe bridge. A handy combi-bridge! Wagenborg Nedlift's bridge specialists came on site for the installation.
In Germany, they are known as 'Expressbrücke': bridges that can be put in place or exchanged within a short time by means of an accelerated construction method or with pre-assembled bridge sections. A godsend, because it shortens traffic jams and disruption as much as possible. This is good news for the business community and residents of a country where some 4,000 (!) bridges will need to be replaced in the next ten years.
Wagenborg Nedlift has recently expanded its road plates range with a new composite variant. These ISOTRACK X road plates are produced from high-quality thermoplastic material, making them exceptionally strong, durable and lightweight. They can also be linked together with a handy connector pin system, thus creating a continuous, non-slip surface with a high load-bearing capacity. Moreover, these composite road plates perform better than conventional ones when it comes to pressure distribution.
The "Ludwig-Volk-Steg" footbridge, built in 1967, connects the communities of Margetshöchheim and Veitshöchheim, near Würzburg. Two of the bridge's piers are located in the navigation channel of the Main River, which can lead to unsafe situations. With this, a new suspension bridge is under construction. With barrier-free ramps and a width of three metres, this suspension bridge allows cyclists and pedestrians to cross the Main River safely, which also allowing for safe passage for shipping traffic.
The railway bridges over the River Oder at Küstrin, on the German-Polish border, were built in 1926. In the past, these bridges connected Berlin with East and West Prussia as part of the so-called Ostbahn. This railway is still important as a detour and alternative route for the Berlin – Warsaw route. But the old railway bridges are at the end of their technical life and out of service since the end of 2020. Therefore, they are replaced by a brand new bridge that completely spans the Oder.
For many years now, Wagenborg Nedlift has had the pleasure of carrying out a wide range of projects for the Genemuiden-based company Breman Machinery B.V., each project more unique than the last. This time round, Wagenborg was tasked with weighing and lifting what is known as an ABIT tool, and transporting it by land and water.
Just last week we began transporting the first of five 380 kV transformers. In the early hours of this morning, the fifth and final transformer was given an official and ceremonial reception at the Vierverlaten high-frequency substation, west of Hoogkerk near Groningen.